New Schembechler Hall Performance Center (photos)

Submitted by Wolverine Devotee on

This is from the Michigan-Cincinnati game program.

A look we haven't seen before. Balcony of cardio and the floor is the weight room.

Scheduled for Winter 2019 completion.

These are from the Regents meeting going on right now.

Total pricetag is $35M

Here is a connector that runs from Schembechler to Oosterbaan

 

mGrowOld

September 14th, 2017 at 4:25 PM ^

I KNEW this would be your post.  FYI I like that you've expanded your game from apparel threads to include "cool photos of stuff the athletic department is building or planning to build in the near future" threads.

conradb42

September 14th, 2017 at 4:27 PM ^

You know when you shoot wadded up paper into the trash from far away and nail it and nobody is looking but you feel awesome? That's how I feel when I correctly guess that something will be a WD post.

Maizen

September 14th, 2017 at 5:12 PM ^

I still think it's dumb to put a weight room in Oosterbaan (should have been torn down and the other sports who use the indoor in the offseason should get built another space) but at least the upgrades to Schembechler look good. Pizza Dave should have never redone the museum, the whole building should have come down and built from scratch. Still marveling at Clemson's facility.

MichiganStan

September 14th, 2017 at 5:22 PM ^

No slide from the second floor to ground level? GARBAGE. How are we ever going to compete with Clemson if we dont have a slide

ThePonyConquerer

September 14th, 2017 at 9:22 PM ^

You know theres gonna be people complaining about this and saying how the money should go towards education.

Esterhaus

September 15th, 2017 at 3:42 PM ^

With candy sprinkles. And that is way too far for this site. Check your MGoPrivilege at least a little bit next time please?

My original paraphrase was lifted from Adam Sandler FWIW. Because words won't hurt us but images can deeply disturb us. Sheesh..